French Pipe Fabrication & Welding

Project Overview

Reed Engineering carried out fabrication and welding works on the French pipe system within the graphite bag house water line. The process involved precise cutting, preparation, alignment, and welding to ensure proper fitment and consistent water flow throughout the system.

Scope of Work