Attrition Feed Pump Installation
Project Overview
- Lindi Jumbo Graphite Mine
- October 2025
Installation of an attrition feed pump, including fabrication of support structures, accurate positioning, and alignment. The pump was successfully integrated into the existing processing system to ensure efficient material handling.
Scope of Work
- Fabrication of pump support structures
- Positioning and placement of the feed pump
- Alignment with existing pipeline/system
- Mechanical installation and fitting
- Integration with operational processing system
- Final inspection and operational checks